Skip to content
Transformers strapped to a flatbed for load-out in Arizona

Arizona · Statewide

Arizona Electrical Equipment Buyers

We purchase switchgear, generators, transformers, substations, panelboards, breakers, MCCs and copper cable across Arizona, and we perform the de-energized removal ourselves.

Licensed and insured crewsPayment before load-outOffer in one business day

Same-day written offer

Get a Written Offer

Send the asset list, or just describe what is in the room. We come back the same business day with a written, itemized offer.

Faster: call 954-740-1983
Email an asset list to electricalequipmentbuyers@gmail.com
Mon–Sat, 7am–7pm PT. We never resell your contact information.

State
Arizona
Cities
34
Utilities
Arizona Public Service, Salt River
Corridors
I-10, I-17, I-8, I-19 and Highway
Offer
Same business day
Phone
954-740-1983

Process

How Arizona jobs actually run

Utility territory matters here more than most owners expect: Arizona Public Service, Salt River Project, Tucson Electric Power, UniSource Energy each have their own disconnect and metering process, and the sequence of who de-energizes what is usually the longest lead item on the schedule.

Freight is the other half. We route Arizona work along I-10, I-17, I-8, I-19 and Highway 60, which is what keeps trailer and crew cost predictable on a quote instead of padded.

Arizona is the fastest-changing territory on this site and the change is what produces equipment. The semiconductor build-out across Chandler, Mesa and north Phoenix is retiring and replacing electrical infrastructure at a pace no other Western state matches, and fab and supplier gear tends to be current-production, well-documented and highly resaleable. Copper mining is the older industrial base — the Morenci, Safford, Miami and Ray operations and the smelter and concentrator infrastructure around them run medium-voltage switchgear, mill motor control centers and large transformers that come out on wear rather than age. Add data centers across the West Valley and Mesa, aerospace and defense at Tucson and Mesa, agricultural processing and irrigation pumping around Yuma and Casa Grande, and a hospital and university stock replacing essential-power systems on documented schedules. Salt River Project and Arizona Public Service both run large distribution replacement programs. Heat matters operationally: outdoor work is scheduled early and equipment that sat in Arizona sun needs its gaskets and enclosures assessed honestly, which we do on the survey rather than after the offer.

Primary hubs

Phoenix, Tucson, Mesa, Chandler, Glendale, Scottsdale and Yuma — but coverage is statewide, including rural substation and mine sites.

Equipment

What we buy in Arizona

Electrical Switchgear

We buy low- and medium-voltage switchgear line-ups out of live plants, substations and buildings scheduled for demolition — metal-clad, metal-enclosed, drawout and fixed-mount.

480 V – 38 kV, up to 5,000 A

Generators

Diesel and natural-gas gensets from 100 kW through 3 MW — enclosed, open-skid, trailer-mounted and sub-base tank units, with or without their transfer switches.

100 kW – 3 MW diesel and gas

Transformers

Pad-mount, dry-type, cast-coil, unit substation and liquid-filled power transformers from 75 kVA through 50 MVA, including units still energized on the pad.

75 kVA – 50 MVA

Panelboards & Switchboards

Panelboards, switchboards, distribution panels, safety switches and disconnects — loaded with breakers or empty, one panel or a whole building's worth.

100 A – 4,000 A

Wire & Cable

Surplus and reclaimed copper and aluminum wire and cable — full spools, partial spools, off-spool coils and cable pulled out of cancelled jobs.

#12 AWG – 1,000 MCM

Circuit Breakers

Molded-case, insulated-case, low-voltage power and medium-voltage vacuum and air-magnetic breakers — single units, pallets and full sets pulled from a line-up.

15 A – 6,000 A frames

Motor Control Centers

Complete MCC line-ups, individual vertical sections, starter buckets and VFD sections — low voltage and medium voltage, any generation.

MCC line-ups, buckets, VFD sections

Substations

Complete unit substations and outdoor station equipment — primary switch, transformer, secondary switchgear, structures, bus and relaying, bought as one lot.

Complete unit and station substations

Transfer Switches

Automatic and manual transfer switches, bypass-isolation switches and paralleling gear, 100 A through 4,000 A, pulled with or without their generators.

100 A – 4,000 A ATS

Capacitors & Power Quality

Fixed and automatically switched capacitor banks, harmonic filters, reactors and power-factor correction equipment, indoor and outdoor.

50 kVAR – 10 MVAR

Complete Plant Lots

When a plant closes, we buy the entire electrical scope as one lot — substation to receptacle — and we do the teardown and loading at our cost.

Whole-facility electrical scope

Common questions

Arizona questions

What is the smallest job you will take in Arizona?

A single transformer, one switchgear section, a pallet of breakers or a few boxes of breakers is worth a call. Because we route crews across Arizona continuously, small Arizona pickups usually get added to an existing run rather than priced as a dedicated trip.

How fast can you get to a Arizona site?

Written offers go out the same business day in nearly every case. After acceptance, typical mobilization to Arizona is a few business days for a straightforward removal and one to two weeks for a full plant scope that needs phasing, rigging plans or utility coordination.

Do we have to disconnect the equipment before you arrive?

No. We handle removal. Your electrician or the utility performs the final isolation and we verify it; from there our crews lock out, cut and cap cable at the gland, unbolt the sections, skate them out and load them. If the Arizona room is still partly live we phase the work.

How do you handle transformer oil in Arizona?

Oil is tested, drained and manifested through licensed handlers, and you receive the documentation with your paperwork. PCB-suspect units go under a separate waste profile. Nothing is left on your pad in Arizona and nothing gets dumped — the handling cost is already in the offer.

When do we get paid?

Before the equipment leaves your Arizona dock. Wire, company check or cashier's check, whichever your accounting group prefers. On large phased projects we pay per load as it ships rather than holding everything until the end.

Equipment sitting in Arizona?

Send photos or a list. We reply the same business day.

954-740-1983

Mon–Sat, 7am–7pm PT · Arizona statewide

Get a Written Offer