Skip to content
Line of pad-mount transformers under high-voltage transmission lines — Seattle, WA

Seattle, WA · Electrical Transformer Buyers

Electrical Transformer Buyers in Seattle, WA

Our Washington desk quotes transformers out of Seattle sites weekly — single items, spares-room clean-outs and complete plant scopes. Send what you have, in whatever form you have it, and the written offer comes back the same business day in a format purchasing can act on.

Licensed and insured crewsPayment before load-outOffer in one business day

Same-day written offer

Get a Written Offer

Send the asset list, or just describe what is in the room. We come back the same business day with a written, itemized offer.

Faster: call 954-740-1983
Email an asset list to electricalequipmentbuyers@gmail.com
Mon–Sat, 7am–7pm PT. We never resell your contact information.

Location
Seattle, WA
Desk
Electrical Transformer Buyers
Ratings
75 kVA – 50 MVA, oil-filled and dry-ty
Offer
Same business day
Payment
Before load-out
Phone
954-740-1983

This city

Transformers buyers serving Seattle

Our Washington routing runs along I-5, I-90, I-405 and Highway 2, which keeps crew and trailer cost predictable for Seattle projects. Coordination with Puget Sound Energy, Seattle City Light, Tacoma Power, Avista, Snohomish County PUD, Chelan and Grant County PUDs on clearances, metering removal and final disconnect is part of the scope, not a change order.

Documentation travels with the job: a certificate of insurance naming your entity, a W-9, a signed purchase agreement itemizing each asset and its price, oil or PCB manifests where applicable, and weight tickets or a bill of lading for what leaves the Seattle site.

Equipment we price without hesitation
ItemDetail
Ratings75 kVA – 50 MVA, oil-filled and dry-type
ScopePad-mount, dry-type, cast coil, substation
NameplatesABB, General Electric, Square D, Eaton, Cooper, Howard, Federal Pacific, Siemens, Waukesha, Kuhlman, Westinghouse, Delta Star, Pennsylvania Transformer, Hammond, Acme
ConditionWorking, retired, water-damaged or already dismantled
MinimumOne section, one unit, or a whole plant lot

Equipment

What we take out of Seattle sites

Liquid-filled pad-mount and station class

Oil-filled pad-mount and pole-mount units, loop-feed and radial, unit substations with their primary switching and secondary sections, and station-class power transformers with tap changers, radiators and conservators. Oil is tested for PCB content before anything moves, and the manifests come with your paperwork.

Dry-type and cast coil

Ventilated dry-type and cast-coil units from 15 kVA through 5 MVA, including 480 V to 208 V step-downs, K-rated units specified for harmonic loads, and drive isolation transformers. Dry-types move easily, resell quickly and generally carry a strong number relative to their weight.

Washington specifics

Washington splits at the Cascades and the two halves produce completely different equipment. West of the mountains the work is aerospace and marine: Boeing and its supplier base around Everett, Renton and Auburn, the Puget Sound shipyards and naval facilities, the container terminals at Seattle and Tacoma, and a dense stock of older industrial buildings along the Duwamish being converted or demolished. Hospital and university plants in Seattle replace essential-power systems on documented programs, which is the kind of paperwork that moves an offer up. East of the Cascades is where the heavy gear is: aluminum smelting legacy at Wenatchee and Goldendale, food processing across the Columbia Basin, the Hanford site and its contractors, and the hydro-fed data center corridor at Quincy and Wenatchee that runs on cheap power and upgrades on a fast cycle. The public utility districts matter here in a way they do not in most states — Chelan, Grant, Douglas and Snohomish own their own distribution, so clearance procedures and surplus disposal practices vary by district and we plan for that rather than being surprised by it.

Common questions

Seattle questions

Can you work nights, weekends or during a shutdown in Seattle?

Regularly. Most electrical removals happen outside production hours because that is when circuits can be released. Night, weekend, holiday and turnaround windows in Seattle are normal scheduling for us, not a premium service.

What happens to the equipment after you buy it?

Serviceable gear is tested, reconditioned where needed and resold as replacement equipment — that resale is what funds your offer. What cannot go back into service is dismantled for copper, aluminum and steel recovery through permitted processors, with regulated fractions documented.

Do you buy equipment that is still energized and in service?

Yes, and most of what we buy is. We quote it now and remove it on your cutover date. Telling us at the quote stage which Seattle assets are still live lets us build the phasing and the clearance coordination into the schedule from the beginning.

Our electrical room is in a basement with a tight door. Is that a problem?

It is routine. Switchgear sections, transformers and gensets frequently have to be cut down or partially disassembled to clear a door width, an elevator limit or a stair turn. The access survey at your Seattle site establishes the path before we commit to a date, and that cost is already inside the offer.

Will you take the equipment we cannot sell along with the good items?

Yes, and this is usually why sellers choose us. Cherry-picking leaves you holding the leftovers of the leftovers. We price the Seattle lot as a whole — good gear, obsolete gear and the scrap fraction together — so the electrical room ends up genuinely empty.

Transformers in Seattle?

One call, one written offer, one crew. Payment before the trailer leaves.

954-740-1983

Mon–Sat, 7am–7pm PT · Seattle, WA and statewide

Get a Written Offer